The Building That Went Gold
By Chuck Choi, 2022 Cutting-edge life science laboratories, the wireless internet of things, radio-frequency simulation, additive & advanced manufacturing, and cybersecurity are some of the elements that comprise the recently completed LEED-certified Building 5,...
First Canadian Place 52nd Floor Renovation
First Canadian Place 52nd Floor Renovation Project Information Location 145 South Bedford Street Burlington, MA 01803 Project Manager Paul McAndrew Jacqueline Valencia Square Feet 350,000 Architect EYP Architecture & Engineering, PC Contractor Gilbane Building...
San Jose Campus 10th Floor Renovation
San Jose Campus 10th Floor Renovation Project Information Location 4 North 2nd Street, San Jose Project Manager David Pereira Square Feet 15,000 Architect Merge, Habitec Contractor MAI Construction Project Description The office high rise at 4 N 2nd Street in...
Dining with Michelangelo and Raphael
Northeastern’s themed tents on the Boston campus bring a new level of dining experience.
Alumni Jenna Vasington & Sarah Warren Pivot & Adapt to Contribute to Northeastern’s COVID-19 Taskforce
Jenna and Sarah of the Design & Construction In-House Design Group was featured in CAMD’s newsletter for their contribution to Northeastern’s COVID-19 Taskforce.