International Village and East Village Lobbies

International Village and East Village Lobbies

International Village and East Village LobbiesProject InformationLocation International VillageEast VillageProject Manager  Vanessa LaubAssistant Project Manager  Lindsey FiorelloSquare Feet 28,000Designer PREF In-House Design & ConstructionContractor N/AThe...

Belvidere Place Office Update

Belvidere Place Office Update

Belvidere Place Office UpdateProject InformationLocation Belvidere PlaceProject Manager  Trenten Kelley Assistant Project Manager  Bruno DariuSquare Feet 11,000 Designer PREF In-House Design & ConstructionContractor Flock ConstructionThe 11,000 square foot...

Gainsborough Breakroom

Gainsborough Breakroom

Gainsborough BreakroomBefore:After:Project InformationLocation Gainsborough GarageProject Manager  Trenten Kelley Assistant Project Manager  Bruno DariuSquare Feet 550Designer PREF In-House Design & ConstructionContractor Costello ConstructionThe break room in...

Building 5, Burlington, MA

Building 5, Burlington, MA

Building 5, Burlington MAProject InformationLocation Burlington, MACampusProject Manager   Paul McAndrew Jacqueline Valencia Square Feet 350,000  Architect EYP Architecture & Engineering, PC Contractor Gilbane Building Company Project DescriptionBuilding 5 is a...

First Canadian Place 52nd Floor Renovation

First Canadian Place 52nd Floor Renovation

First Canadian Place 52nd Floor RenovationProject InformationLocation 145 South Bedford Street Burlington, MA 01803 Project Manager   Paul McAndrew Jacqueline Valencia Square Feet 350,000  Architect EYP Architecture & Engineering, PC Contractor Gilbane Building...

San Jose Campus 10th Floor Renovation

San Jose Campus 10th Floor Renovation

San Jose Campus 10th Floor RenovationProject InformationLocation 4 North 2nd Street, San JoseProject Manager   David PereiraSquare Feet 15,000 Architect Merge, Habitec Contractor MAI ConstructionProject Description The office high rise at 4 N 2nd Street in downtown...

EXP

EXP

The new 350,000 square foot research center will be located between the Interdisciplinary Science and Engineering Complex (ISEC) and Ruggles Station, and is scheduled to be completed by 2023

Vancouver Campus 14th Floor Renovation

Vancouver Campus 14th Floor Renovation

Vancouver Campus 14th Floor RenovationProject InformationLocation 410 West Georgia Street, VancouverProject Manager   David PereiraSquare Feet 15,000 Architect OSO , KasianContractor TurnerProject DescriptionNortheastern’s downtown Vancouver campus is located in a new...

Veterans Memorial

Veterans Memorial

Veterans MemorialProject InformationLocation Axis of Snell Library Centennial CommonProject Manager Mark BontempoSquare Feet  3,000Project Description   The simple yet elegant memorial, located at the intersection of Forsyth Street and Centennial Common, features...

Anechoic Chamber

Anechoic Chamber

Anechoic Chamber Project Information Location Innovation Campus Burlington, MA Project Manager Andraya Lombardi Square Feet 30,000 sf exterior drone cage + 5,700 SF  Architect Workplace Creations Contractor Workplace Creations Project Description The Unmanned Aerial...

Matthews Arena Scoreboard

Matthews Arena Scoreboard

Matthews Arena ScoreboardProject Information Location Matthews ArenaBoston, MAProject Manager Ian ParksSquare FeetProject Description   A new state-of-the-art center-hung scoreboard and sound system was installed in the historic Matthews Arena.  Designed and...

225 Terry Ave. – Seattle

225 Terry Ave. – Seattle

225 Terry Ave. – SeattleProject Information Location:  Seattle Campus – WashingtonProject Manager:  David PereiraSquare Feet:  18,121The goal of the project was to create more flexible collaborative zones on our Seattle campus.

Carter Air Structure

Carter Air Structure

Carter Air StructureProject Information Location: Carter FieldProject Manager:  Ian ParksSquare Feet:  N/AThe Carter Air Structure, which rises 72 feet above the ground at its peak height, allows the field to be used year-round by thousands of Northeastern students...